Orion telekom
Configurator Allocation Contact
GB300 NVL72 · Europe · January 2027

Blackwell Ultra capacity, reserved before it exists.

Orion Factory is bringing NVIDIA GB300 NVL72 racks online in our European data center from January 2027 - reservable from a single tray to multiple racks. Capacity is allocated from a priority queue: join now and lock your position before the first racks are committed.

72× B300
Blackwell Ultra GPUs / rack
1,440 PFLOPS
FP4 compute / rack
37 TB
fast memory / rack
130 TB/s
NVLink 5 fabric

Join the waiting list

Allocation review begins Q4 2026. Queue position is set by order of registration and cluster size.

No commitment at this stage. We confirm your queue position within 48 hours.

You're in the queue

We've logged your request. Expect a confirmation of your position within 48 hours - allocation review begins Q4 2026.

Size your cluster

Drag to your GPU count - from a single tray to a multi-rack NVLink-connected fleet. We allocate at any scale; no full-rack minimum.

72 GPUs
1 full NVL72 rack
48163672144288576
20.7 TB
HBM3e total
1,440 PFLOPS
FP4 compute
37 TB
Fast memory
1 rack
NVL72 racks
Reserve this configuration

January allocation - Rack 01

0 / 72 GPUs reserved
Reserved Available
One cell = one Blackwell Ultra GPU · NVL72 = 72 GPUs per rack

Built for what you're building

TRAIN

Frontier training

Train trillion-parameter and MoE models on a unified 72-GPU NVLink domain per rack - 37 TB of fast memory keeps checkpoints, batches and context where they belong.

REASON

AI reasoning

Test-time scaling can demand 100× the compute of one-shot inference. Blackwell Ultra's 2× attention acceleration and FP4 efficiency are built for exactly this.

SERVE

High-throughput inference

Hold large models and long KV caches entirely in GPU memory for low-latency serving at maximum tokens per second - and per megawatt.

How allocation works

STEP 01 - NOW

Reserve your position

Join the waiting list with your cluster size and target start. No payment, no commitment - your position in the queue is timestamped.

STEP 02 - Q4 2026

Allocation review

Our engineers walk through your workload, configuration and terms - with transparent reserved-capacity pricing, confirmed in a signed allocation agreement.

STEP 03 - JANUARY 2027

Deployment

Racks come online in our European data center. Confirmed customers get white-glove onboarding and direct engineering support.

Why Orion Factory

Telecom-grade infrastructure operated by Orion telekom, delivered as an AI factory built with NVIDIA.

Any scale, no full-rack minimum

Most providers allocate GB300 only as complete racks. We reserve from a single 4-GPU tray to multi-rack clusters - grow into your capacity, don't overbuy it.

NVIDIA Partner Network

We deploy GB300 NVL72 as an NPN partner - reference architecture, validated networking and direct access to NVIDIA engineering.

European data residency

Your models and data stay in Europe, in facilities we own and operate - with low latency to EU markets and full jurisdictional clarity.

Carrier backbone included

As a telecom operator we bring our own fiber and peering. Multi-terabit connectivity to your cluster is part of the offer, not an add-on.

Reserved means reserved

Capacity is allocated once, in queue order. We would rather run a real waiting list than oversell racks that don't exist yet.

Prefer to talk first?

Skip the queue form - our infrastructure engineers will walk you through configurations, networking and timelines directly.

We reply within one business day.

Message received

One of our infrastructure engineers will get back to you within one business day.